- Owner:
- Progetto CMR International
- Works start:
- 10/06/2025
Description
The design for the new swimming pool in Legnano includes two indoor pools, an outdoor pool, a water park with slides and a solarium. The structure will be built using sustainable, energy-efficient materials, reducing energy consumption by 20%.
Schedule
Work on the new swimming pool in Legnano began in June 2025. The construction site opened on 16 December, with the installation of the pools scheduled for February 2026. The facility will be completed by June 2026, with the opening planned for September 2026.
- in progress
1 Ideation
La fase di ideazione della nuova piscina di Legnano include la progettazione e pianificazione dell’impianto, con l'uso di tecnologie avanzate per vasche, aree polifunzionali e un focus su sostenibilità ed efficienza energetica.
2 Design
La fase di progettazione della piscina di Legnano ha definito vasche natatorie, aree polifunzionali e spazi esterni, con un focus su sostenibilità ed efficienza energetica, utilizzando materiali innovativi.
3 Execution of the work
La fase di esecuzione lavori ha visto l'installazione delle travi lamellari e la preparazione per le vasche. A febbraio 2026 inizierà l'installazione delle vasche, seguita dagli impianti e parco acquatico.
4 End of work
Description coming soon
Gallery
History
Sportium, a company within the Progetto CMR Group, has been appointed to oversee construction work on the Ferdinando Villa Swimming Pool in Legnano, which is scheduled for completion in summer 2026. The project involves the refurbishment of the existing 50-metre, four-lane summer pool, the creation of a new leisure and recreation area, and the expansion of the sunbathing area and outdoor spaces.
The facility, with its main entrance on Viale Toselli, will house two 25-metre indoor pools (an eight-lane competition pool and a four-lane training pool) and a children’s pool. The centre will also feature new changing rooms and a 200-seat grandstand. The outdoor area will feature an outdoor pool, a water park with slides and a large green space.
The energy-efficient complex will consume 20% less energy than the standards for low-impact buildings. Materials, such as wood, have also been chosen with sustainability in mind. The facility is scheduled to open to the public in September 2026.