- Owner:
- RI - Blindaggio scavo
- Place
- Pandino, Pandino area
- Works start:
- 20/09/2025
Description
In the Pandino (CR) area, work on the SNAM Rete Gas network methane pipeline: deep excavations for pipe laying/upgrading. Pizio Spa operates safely with Series 750 SBH closed box shielding, stable even on challenging terrain.
Schedule
Surveying and site preparation. Deep excavation in sections. Lowering and advancement of the 750 SBH series closed box to contain the walls. Laying/adjustment of the methane pipeline, checks and tests. Backfilling, restoration and dismantling.
- in progress
1 Ideation
Definizione dell’intervento sul metanodotto SNAM in zona Pandino: obiettivi, tracciato e scavi profondi. Analisi rischi terreno/servizi e scelta del blindaggio Serie 750 SBH per operare in sicurezza.
2 Design
Progetto esecutivo del tratto: sezioni di scavo profondo, fasi per tratti e logistica. Dimensionamento blindaggio Serie 750 SBH, piani sicurezza e interferenze. Definite prove, reinterri e ripristini finali.
3 Execution of the work
Cantierizzazione e scavo profondo per tratti. Calo e avanzamento del box Serie 750 SBH a cassa chiusa per stabilizzare le pareti. Posa/adeguamento condotta, controlli e prove. Reinterro e ripristini.
4 End of work
Description coming soon