Gas pipeline

Gas pipeline

Works start:
20/09/2025

Description

In the Pandino (CR) area, work on the SNAM Rete Gas network methane pipeline: deep excavations for pipe laying/upgrading. Pizio Spa operates safely with Series 750 SBH closed box shielding, stable even on challenging terrain.

Schedule

Surveying and site preparation. Deep excavation in sections. Lowering and advancement of the 750 SBH series closed box to contain the walls. Laying/adjustment of the methane pipeline, checks and tests. Backfilling, restoration and dismantling.

  1. in progress