- Owner:
- RI - Blindaggio scavo
- Works start:
- 22/05/2021
Description
Foligno–Terni–Civita–Rome West methane pipeline (DN 550/22”): PBR Technology carries out modifications and crossings in railway areas and decommissioning of existing sections for SNAM, with complex excavations protected by Series 750 shoring.
Schedule
Surveying and tracing. Construction site set-up in railway areas. Trench excavation for variants/crossings with Series 750 shielding. Laying and welding DN 550, checks and leak tests. Decommissioning of existing sections, backfilling and final restoration.
- in progress
1 Ideation
Definizione delle varianti del metanodotto Civita–Roma Ovest: obiettivi, tracciato e attraversamenti ferroviari, più dismissione tratti esistenti. Analisi rischi e scelta del blindaggio per scavi complessi.
2 Design
Progetto esecutivo DN 550: dettagli di varianti e attraversamenti ferroviari, sezioni di scavo e logistica. Piani sicurezza e interferenze, procedure di dismissione e ripristini, controlli e prove di tenuta.
3 Execution of the work
Cantierizzazione e scavi in aree ferroviarie. Installazione blindaggi Serie 750 per lavorare in sicurezza. Posa e saldatura DN 550, controlli e prove. Dismissione dei tratti esistenti, reinterro e ripristini.
4 End of work
Collaudo del metanodotto e verifiche finali (tenuta e controlli). Chiusura dismissioni, reinterro e ripristino definitivo delle aree e delle interferenze ferroviarie, smobilitazione e consegna.