The project at Malpensa involved the redevelopment of runway 17L/35R and taxiways D and E at a cost of €11 million, covering 168,000 m². Over 150 workers operated around the clock, focusing on the circular economy and 100% recycled materials.
Schedule
Work commenced on the night of 8 September 2021; in approximately 35 days, with 24/7 shifts and over 150 resources, demolition, repaving and installation of new LED signals were carried out.
- in progress
1 Ideation
La fase di ideazione ha analizzato le esigenze operative di Malpensa, definendo un piano di riqualifica delle piste volto a migliorare sicurezza, capacità e sostenibilità attraverso tecniche e materiali innovativi.
2 Design
La progettazione ha definito modalità e fasi della riqualifica della pista 17L/35R, integrando sicurezza aeroportuale, gestione H24 dei flussi e uso di materiali riciclati per garantire prestazioni elevate.
3 Execution of the work
L’esecuzione lavori si è svolta con turni H24, demolizioni e rifacimento della pista 17L/35R, posa di nuovi impianti e segnaletica LED, garantendo continuità operativa e massima sicurezza aeroportuale.
4 End of work
A fine lavori la pista 17L/35R è stata completamente riqualificata e riaperta, con nuove pavimentazioni, impianti LED e superfici rigenerate, migliorando sicurezza ed efficienza delle operazioni di volo.
Gallery
History
With a total of 150 staff working in shifts 24 hours a day, 7 days a week, minimal environmental impact, over 85,000 tonnes of material laid, 70 km of new cables for 850 new AVLs, the project promises to be unprecedented in terms of organisation and completion times, and is set to become a landmark in the history of the sector.
Work on the refurbishment of runway 17L/35R at Malpensa began on the night of 8 September 2021, under the supervision of SEA’s Works Management, with Vitali S.p.A. undertaking the redevelopment and modernisation of runway 17L/35R and taxiways D and E at Milan Malpensa Airport for just over a month. An €11 million project that placed a strong emphasis on the circular economy, environmental sustainability and the reuse of construction materials.
In addition to the runway, the associated taxiways and AVL (Aids to Visual Landing) systems were also upgraded with 850 new LEDs, which are more visible and energy-efficient, installed across a total of over 70 km of new cabling.
The project was designed with sustainability in mind, maximising the reuse of materials from the demolition of existing pavements and foundations, and minimising waste production through on-site processing, with the aim of minimising the overall environmental impact of the works. This approach has also made it possible to reduce the traffic of construction vehicles to and from the airport, resulting in a significant reduction in CO2 emissions.