White water network

White water network

Works start:
10/01/2025

Description

Cesara (VB): safety measures on Via Dante and renovation of the rainwater drainage system. Concrete pipes were removed and new HDPE pipes were laid to improve drainage and durability, with trench excavation protected by the SBH Series 100 box.

Schedule

Survey and set out Via Dante. Set up site and manage traffic. Sectional excavation with SBH 100 boxes. Remove old concrete pipes, install new HDPE pipes and connections. Backfill, reinstate road surface, test drainage.