Curing
The period in which concrete gains strength after the pour. Design strength is measured at 28 days, but formwork comes off earlier, once tests allow. Cold slows it down; in heat the concrete must be protected from drying out.
The period in which concrete gains strength after the pour. Design strength is measured at 28 days, but formwork comes off earlier, once tests allow. Cold slows it down; in heat the concrete must be protected from drying out.